{"id":28,"date":"2019-07-08T15:27:36","date_gmt":"2019-07-08T14:27:36","guid":{"rendered":"http:\/\/www.theprestigegroup.net\/services\/?page_id=28"},"modified":"2019-07-08T22:22:01","modified_gmt":"2019-07-08T21:22:01","slug":"prestige-stairwell-protection","status":"publish","type":"page","link":"https:\/\/www.theprestigegroup.net\/services\/prestige-stairwell-protection\/","title":{"rendered":"Prestige Stairwell Protection"},"content":{"rendered":"<p><a href=\"http:\/\/www.theprestigegroup.net\/services\/prestige-stairwell-protection-gallery\/\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-418 size-full\" src=\"http:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/page-stair2.jpg\" alt=\"\" width=\"1170\" height=\"350\" srcset=\"https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/page-stair2.jpg 1170w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/page-stair2-300x90.jpg 300w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/page-stair2-768x230.jpg 768w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/page-stair2-1024x306.jpg 1024w\" sizes=\"auto, (max-width: 1170px) 100vw, 1170px\" \/><\/a><\/p>\n<p>Prestige designed this system 8 years ago and has had a huge success on supplying the construction industry with this safe efficient system that can be used over and over again.<\/p>\n<p>Unlike other systems on the market that have not been tested our system has been tested and is supplied with test certification and complies with British Standard BS EN 13374 The Standard For Temporary Edge Protection Systems.<\/p>\n<h3>EASY TO FIT, EASY TO REMOVE<\/h3>\n<p>The system is designed to prevent fall from height to open stair cases during construction.<br \/>\nSteel hanger brackets are placed over timber newel posts without any screws being screwed into post.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-425\" src=\"http:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/slides.jpg\" alt=\"\" width=\"1170\" height=\"300\" srcset=\"https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/slides.jpg 1170w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/slides-300x77.jpg 300w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/slides-768x197.jpg 768w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/slides-1024x263.jpg 1024w\" sizes=\"auto, (max-width: 1170px) 100vw, 1170px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Timber batons are then placed into bracket and are secured to timber baton via a screw.<\/p>\n<h3>\u201cMAKING SITE SAFER\u201d<\/h3>\n<p>Brackets are available to suit all types of stair designs and are finished in a powder coated top\u00a0coat.<\/p>\n<p>The systems can be delivered to site within two days of order, please call for your free quotation.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-326\" src=\"http:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/accreditations.jpg\" alt=\"\" width=\"850\" height=\"155\" srcset=\"https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/accreditations.jpg 1100w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/accreditations-300x55.jpg 300w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/accreditations-768x140.jpg 768w, https:\/\/www.theprestigegroup.net\/services\/wp-content\/uploads\/2019\/07\/accreditations-1024x186.jpg 1024w\" sizes=\"auto, (max-width: 850px) 100vw, 850px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prestige designed this system 8 years ago and has had a huge success on supplying the construction industry with this safe efficient system that can be used over and over again. Unlike other systems on the market that have not &hellip; <a href=\"https:\/\/www.theprestigegroup.net\/services\/prestige-stairwell-protection\/\">Continued<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-fullwidth.php","meta":{"footnotes":""},"class_list":["post-28","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.theprestigegroup.net\/services\/wp-json\/wp\/v2\/pages\/28","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.theprestigegroup.net\/services\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.theprestigegroup.net\/services\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.theprestigegroup.net\/services\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.theprestigegroup.net\/services\/wp-json\/wp\/v2\/comments?post=28"}],"version-history":[{"count":11,"href":"https:\/\/www.theprestigegroup.net\/services\/wp-json\/wp\/v2\/pages\/28\/revisions"}],"predecessor-version":[{"id":427,"href":"https:\/\/www.theprestigegroup.net\/services\/wp-json\/wp\/v2\/pages\/28\/revisions\/427"}],"wp:attachment":[{"href":"https:\/\/www.theprestigegroup.net\/services\/wp-json\/wp\/v2\/media?parent=28"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}